03 · Steel protection

Application and quality control

Once the system is chosen, it has to go on in permitted conditions and at the right thickness. Inspection happens at every coat, not only at the end.

minimum margin of the surface above dew point
+3 °C
thickness acceptance rule, ISO 19840
80/20
interval for logging conditions
4 h

3 min read

01Application conditions

  • Surface temperature — at least 3 °C above the dew point; you can check it in the guide on temperature and dew point.
  • Air, surface and paint — within the TDS range: for Teping® epoxy products usually +5 to +40 °C, with application allowed down to −10 °C.
  • Relative humidity — up to 85 % for epoxy products; Teping PU-Coat Top, which cures with air moisture, allows 30–98 %.
  • No rain or fog, wind no stronger than 10 m/s; in enclosed spaces, supply and exhaust ventilation.
  • Air temperature, humidity, dew point and steel temperature are logged at the start of each shift and every 4 hours.

02Wet and dry film

The painter checks the wet film thickness (WFT) with a comb gauge right after application. It gives the future dry film thickness (DFT) through the volume solids (VS):

ValueFormula
Wet film thicknessWFT = DFT × 100 / VS
Volume solids after thinningVS₁ = VS × 100 / (100 + % thinner)
Theoretical consumption, l/m²DFT / (VS × 10)
Practical consumption, l/m²theoretical consumption × 100 / (100 − % losses)

Losses depend on the shape of the structure, the profile, wind and application method; they are higher on lattice structures than on flat plates.

03Accepting thickness and adhesion

  • Dry film thickness is measured with a magnetic or eddy-current gauge to ISO 2808 and ISO 19840.
  • The 80/20 rule: the mean is not below nominal, no reading is below 80 % of nominal, and readings between 80 and 100 % of nominal make up no more than 20 %.
  • The maximum thickness is limited by the TDS: an overbuilt coat may crack.
  • Adhesion is checked by cross-cut to ISO 2409 or by pull-off to ISO 4624; the requirements come from the design.
  • The next coat goes on only after the previous one is accepted and within the overcoating interval of the TDS.

04Typical defects and how to avoid them

DefectCauseHow to avoid
Sags and runscoat too thick, low viscosity, gun too closehold the gun at 200–400 mm and at right angles, check the WFT
Dry spraygun too far or at an angle, heat, fast solventkeep the distance, work within the permitted temperatures
Flakingpoor preparation, contamination between coats, missed overcoating intervalcheck cleanliness, keep intervals, abrade an over-cured coat
Blisters and pinholessalts, moisture or oil on the surface, wrong thinnerwash and degrease, check salts, use only the approved thinner
Crackingoverbuilt coat, overcoating a wet coat, hot surfaceeven thickness within the TDS, control the steel temperature
Uneven colour and glosscold and high humidity, poor mixingwork within limits, mix the components thoroughly

Find a system to ISO 12944

Sources. ISO 12944, ISO 8501, ISO 8502, ISO 8503, ISO 19840, GOST 9.402, SP 28.13330 and the technical data sheets of Teping® products on tnpgroup.ru. Check project values against the current TDS.

Questions

Common questions about corrosion protection

Can coatings be applied in winter?

Yes, within the TDS. Teping® epoxy products may be applied down to −10 °C, while the polyurethane primers and Teping PU-Coat Top cure with air moisture and work at high humidity. What matters is steel free of frost and ice, 3 °C warmer than the dew point, and paint kept warm before use.

How is coating thickness checked?

The painter checks the wet film with a comb gauge during application and the dry film with a gauge after drying, by the ISO 19840 80/20 rule: the mean not below nominal, no reading below 80 % of nominal. More in Application and quality control.

Is it better to apply the system in the shop or on site?

Preparation, temperature and thickness are easier to control in the shop, so the primer and intermediate coat are best applied there: Teping EP-Coat Primer suits shop application. On site, transport and welding damage is repaired and the topcoat applied.

Let us protect your structure

Send the corrosivity category, durability and area — a TNP technologist will select a Teping® system, coat thicknesses and consumption.

PROJECT ENQUIRY

Let’s find the
right solution.

Prepare your enquiry, then copy it or open it in your email app to send to our team.

Ask our team for current technical and safety data sheets. Available document languages will be confirmed in reply.

This page prepares an email only. Nothing is sent until you send it from your email app.

Write directly to order@tnpgroup.ru