Industrial floor · Cement
Teping Cem 40
Spark-free high-strength floor
Cement mix with marble aggregate for impact-resistant, spark-free industrial floors 20–100 mm thick. It withstands heavy static and mechanical loads and liquids; the material is non-combustible (NG class).
- Layer thickness
- 20 – 100 mm
- Compressive strength (28 days)
- ≥ 50 MPa
- Walk-on after
- 24 h
- Frost resistance
- F300

Overview
The product at a glance
Key points
- No sparks on impact
- Walk-on after 24 hours
- Frost resistance F300, indoors and out
Where it is used
Facilities
- Manufacturing
- Warehouses
- Oil and gas industry
Purpose
- Industrial sites that require spark-free floors
- Workshops, warehouses and plant rooms with heavy mechanical loads
- Areas exposed to liquids
Specifications
Technical data
Data from the TNP technical data sheet. Check the application instructions before design.
- Layer thickness
- 20 – 100 mm
- Compressive strength (28 days)
- ≥ 50 MPa
- Flexural strength (28 days)
- ≥ 10 MPa
- Bond to concrete
- ≥ 0.8 MPa
- Frost resistance
- F300
- Water impermeability
- W16
- Abrasion
- ≤ 0.6 g/cm²
- Fire hazard class
- Non-combustible (NG)
- Working time
- ≤ 40 min
- Walk-on after
- 24 h
- Service temperature
- −50 … +70 °C
- Consumption
- 1150 – 1200 kg of mix and 1150 – 1200 kg of aggregate per 1 m³
Quantity for your project
Consumption 1.15–1.2 kg/m² per 1 mm of thickness. An estimate from the consumption in the technical data sheet, without allowance for the substrate or losses. A TNP technologist will calculate the exact quantity.
Which thickness to choose
- 20 – 100 mm
- Spark-free industrial floor
- from 40 mm
- On a separating layer of film ≥ 100 µm
Installation
How it is applied
- 1Surface preparationThe substrate must be sound and dry (moisture up to 5 %), free of dust, oil and laitance; concrete at least 1–3 months old, screed at least 28 days.
- 2PrimingAn absorbent substrate is primed in two coats 2–3 hours apart; a non-absorbent one is milled or given a bonding primer. The mix is laid once the primer has fully dried.
- 3Preparing the mixPour 4–5 l of water per kit into a concrete mixer, add 25 kg of mix and 25 kg of marble aggregate, mix, then mix again after 3 minutes.
- 4ApplicationLay in strips between screed rails, level with a straightedge or vibrating screed and trowel once initial strength is reached. Protect from drying out for the first 3 days.
- 5Anchor groovesRepeat the substrate joints in the floor; without joints, cut bays of up to 6 × 6 m after 24–48 hours and fill them with polyurethane sealant after 7–10 days.
Packaging and delivery
- Dry mix
- 25 kg
- Marble aggregate 5–10 mm
- 25 kg
Product documents
Sent with the reply from a TNP technologist. Say in your enquiry which documents you need.

Your expert
Alexandra Antoshko
Head of Sales · Dry floor mixes
Helps you choose a coating, sends the TDS and works out quantities. Write in whichever of these languages suits you.
Let us match a solution to your project
Tell us the area, substrate and service conditions. A TNP technologist will suggest a system and calculate quantities and delivery times.

