Underlay · SBR
Teping Sport Roll Base
SBR rubber underlay
Elastic rolled underlay of SBR rubber crumb up to 2.5 mm, used to cushion poured floors, artificial turf, laminate, parquet and linoleum.
- Thickness
- 4–12 mm
- Colour
- Black SBR granules
- Density
- up to 850 kg/m³
- Format
- Roll 1.25 × 3–20 m

Overview
The product at a glance
Key points
- Base for polyurethane sports floor systems
- For indoor and outdoor use
- Does not retain water
Before specifying
Specify as an underlay within a floor system with a separate finish.
Where it is used
Facilities
- Sports halls
- Children's playrooms
- Recreation areas
- Ice arenas
Industries
Projects
Guides
Specifications
Technical data
Data from tnpgroup.ru. Check the application instructions before design.
- Density
- up to 850 kg/m³
- Thickness
- 4 – 12 mm
- Length
- 3 to 20 m depending on thickness; ask your TNP manager
- Width
- 1,250 mm
- Service temperature
- −40 to +110 °C
Roll formats
All seven rolled coatings are made 4, 6, 8, 10 and 12 mm thick. Rolls are cut to order from 3 m long; the maximum length depends on the thickness. Our sales team will confirm the exact length.
| Thickness | Width | Roll length | Roll area, up to | Weight per m², up to |
|---|---|---|---|---|
| 4 mm | 1,250 mm | 3–20 m | 25 m² | 3.4 kg |
| 6 mm | 1,250 mm | 3–13 m | 16.25 m² | 5.1 kg |
| 8 mm | 1,250 mm | 3–10 m | 12.5 m² | 6.8 kg |
| 10 mm | 1,250 mm | 3–8 m | 10 m² | 8.5 kg |
| 12 mm | 1,250 mm | 3–6 m | 7.5 m² | 10.2 kg |
Weight is calculated from the coating's maximum density.
All formats on the category pageInstallation
How it is applied
- 1Material preparationBefore installation, keep the rolls and the adhesive indoors at room temperature for 24 hours. Before application, mix the contents of the adhesive pail for 1 minute with a mixer at low speed.
- 2Applying adhesive and layingApply the adhesive with a notched trowel. Let it flash off for 10 – 15 minutes, then lay Teping® Sport "Roll" into the still-wet adhesive. Once laid, press the surface down firmly, especially along the seams.
- 3DryingThe standard wait before the surface is ready for use is 24 – 48 hours.
What you will need
Tools
- Roller
- Notched trowel
Equipment
- Industrial vacuum cleaner
- Industrial hand mixer
Also needed
Systems
Used in coating systems
Ready-made systems from the TNP technical solutions album that include this product.
Product documents
Sent with the reply from a TNP technologist. Say in your enquiry which documents you need.
- Application instructions
- State registration certificate

Your expert
Andrey Petrov
Sales Manager · Sports surfaces
Helps you choose a coating, sends the TDS and works out quantities. Write in whichever of these languages suits you.
Let us match a solution to your project
Tell us the area, substrate and service conditions. A TNP technologist will suggest a system and calculate quantities and delivery times.






