Teping® manufacturer
Visualiser
EN ⌄
Menu

Levelling screed · Cement

Teping Cem Universal

Self-levelling cement screed

One-component, polymer-modified, fast-drying mix for final levelling of concrete and sand-cement substrates 5–30 mm thick under parquet, tiles, seamless resins and resilient floor coverings. Walk-on after 3–4 hours.

Layer thickness
5 – 30 mm
Compressive strength (28 days)
≥ 40 MPa
Walk-on after
3 – 4 h
Consumption
1.8 kg/m² per 1 mm
Estimate quantityCoating in 3D
Teping Cem Universal: application example

Overview

The product at a glance

Key points

  • Walk-on after 3–4 hours
  • 1.8 kg/m² per 1 mm
  • Suitable for underfloor heating

Where it is used

Facilities

  • Apartments and offices
  • Manufacturing
  • Warehouses
  • Car parks, garages
  • Shopping centres
  • Sports facilities

Purpose

  • Final levelling of concrete and sand-cement substrates under parquet, tiles, seamless resins, textile and resilient floor coverings
  • Must not be used without a protective or sealing topcoat
  • Not suitable for slopes over 0.5 %

Specifications

Technical data

Data from the TNP technical data sheet. Check the application instructions before design.

Layer thickness
5 – 30 mm
Consumption
1.8 kg/m² per 1 mm
Compressive strength (28 days)
≥ 40 MPa
Flexural strength (28 days)
≥ 9 MPa
Bond to concrete
≥ 1.5 MPa
Frost resistance
F200
Water impermeability
W12
Abrasion
≤ 0.7 g/cm²
Fire hazard class
Non-combustible (NG)
Working time
≤ 25 min
Walk-on after
3 – 4 h
Full load after
24 h
Water per 25 kg bag
5.2 – 5.5 l
Installation temperature
+10 … +25 °C

Which thickness to choose

5 – 15 mm
Impermeable coating after 24 hours
15 – 30 mm
Impermeable coating after 48 hours

Installation

How it is applied

  1. 1Surface preparationA substrate of at least 15 MPa and up to 5 % moisture is ground, milled or shot-blasted and vacuumed.
  2. 2PrimingPrime the substrate with Teping NG Primer AS, a highly absorbent one in two coats; lay the mix once the primer has fully dried.
  3. 3Preparing the mixAdd a 25 kg bag to 5.2–5.5 l of water, mix with a paddle for 2–3 minutes, then mix for another minute after a 2-minute pause.
  4. 4ApplicationPour onto the substrate, spread with a squeegee and roll with a spiked roller in two directions. Before an impermeable coating wait 24 hours for up to 15 mm and 48 hours for up to 30 mm.

Packaging and delivery

Bag
25 kg

Product documents

Sent with the reply from a TNP technologist. Say in your enquiry which documents you need.

    Your expert

    Alexandra Antoshko

    Head of Sales · Dry floor mixes

    Helps you choose a coating, sends the TDS and works out quantities. Write in whichever of these languages suits you.

    Languages

    • English
    • Русский
    • Қазақша
    • Ўзбекча
    • Тоҷикӣ
    Emailinfo2@tnpgroup.ru

    Let us match a solution to your project

    Tell us the area, substrate and service conditions. A TNP technologist will suggest a system and calculate quantities and delivery times.

    PROJECT ENQUIRY

    Let’s find the
    right solution.

    Prepare your enquiry, then copy it or open it in your email app to send to our team.

    Ask our team for current technical and safety data sheets. Available document languages will be confirmed in reply.

    This page prepares an email only. Nothing is sent until you send it from your email app.

    Write directly to order@tnpgroup.ru