System 5.4 · Sports and safety surfaces
Teping Sport PU combined surface
A rubber roll underlay under a tough-elastic polyurethane self-levelling floor: a seamless sports surface for halls.
- Thickness
- thin coat
- Layers
- 6
- Total consumption
- ≈ 5.1–5.7 kg/m²
- Service range
- −20 to +60 °C

Colour RAL 5007
Gloss
The cutaway is redrawn right in your browser.
This gloss is not in the album: TNP's technical team will choose the layers for it.
Build-up
Layer by layer
The drawing is schematic; layer thicknesses are not to scale. Point at a layer to find it in the drawing; product names lead to their cards.
- 1 PrimingTeping PU Primer 1K 0.2–0.4
- 2 Adhesive layerTeping AD RT 1
- 3 Rubber roll underlayTeping Sport Roll Base per design
- 4 Scratch coatTeping Floor 205 PU Filler 1.2
- 5 TopcoatTeping Floor 205 PU S 2.6–3
- 6 Protective varnishTeping Floor 205 PU Varnish Matt 0.13
- Total≈ 5.1–5.7 kg/m²
Indicative estimate from the album consumption figures. Our technologist will confirm exact quantities for your substrate, with a margin.
Where it is used
- Sports halls
- Gyms
- Schools
- Multi-purpose halls
Site types
Advantages
- The underlay absorbs impact and reduces noise
- Seamless, easy-to-clean surface
- Matt varnish protects against wear
Service conditions
- Mechanical load
- Moderate to significant: foot traffic, trolleys and forklifts on rubber tyres
- Liquids and chemicals
- Water, fuels and oils, weak solutions of salts, acids and alkalis
- Service temperature
- −20 to +60 °C
- Appearance
- Matt, smooth; colours from the RAL K7 Classic chart
Substrate requirements
- Moisture: max 5%
- Concrete age: at least 28 days
- Compressive strength: at least 20 MPa
- Pull-off strength: at least 1.5 MPa
- Evenness: max 2 mm under a 2 m straightedge
- The substrate must be sound, uniform, clean and dry, free of laitance, oil, grease and old coatings.
Products
Products in this system
Every product in the system is made by TNP Group under the Teping® brand.
On site
Where a similar system already works
TNP Group sites finished with a close build-up of layers.
We will calculate the system for your site
Send us the area, substrate type and service conditions. A TNP technologist will confirm the build-up, quantities and delivery times.










