Teping® manufacturer
Visualiser
EN ⌄
Menu

07 · Sports surfaces · Polyurethane materials

Rubber crumb and EPDM surfaces for playgrounds and sports grounds

Seamless surfaces of rubber crumb or EPDM rubber with a polyurethane binder are laid indoors and outdoors. They withstand frost, rain and long exposure to the sun, are safe for people and animals and release no volatile organic compounds.

Sport Classic and Sport EPDM
from 10 mm
two-layer Sport Combi
12–20 mm
until foot traffic
24 h

4 min read

01Three seamless options

Sport ClassicSport EPDMSport Combi
Compositionblack rubber crumb, binder, pigmentcoloured EPDM rubber, binderblack crumb shock pad, coloured EPDM top
Thicknessfrom 10 mmfrom 10 mm12–20 mm
Coloursterracotta, green, black11 colours11 colours on top
Service temperature−50 to +45 °C−50 to +45 °C−50 to +45 °C
Chosen forreliable budget surfacebright colour, freeze-thaw resistancecolour and cushioning at a good price

All three are water-permeable. They suit playgrounds, running tracks, outdoor sports grounds, tennis courts, pool surrounds and footpaths. Build-ups and consumption per layer: Sport Classic, Sport EPDM, Sport Combi.

02Indoors: rolls

In gyms and fitness centres rolled surfaces are laid instead: Teping Sport Roll of SBR crumb, Sport Roll S with a dense smooth surface, Sport Roll EPDM with coloured granules, and the Sport Roll Base underlay. Rolls are 1.2 m wide and 2–40 mm thick. They are glued with two-component Teping AD RT at 0.8–1.5 kg/⁠m², spread with a notched trowel. A roll underlay under a polyurethane self-levelling finish gives the Teping Sport PU system.

03Bases

  • Concrete: moisture up to 5 %, age at least 28 days, compressive strength at least 20 MPa, pull-off at least 1.5 MPa, no more than 2 mm under a 2 m straightedge. Remove laitance and oil, then prime with the binder using a roller.
  • Asphalt: prepared to SP 31-115-2006, clean, primed with the binder.
  • Ground: a compacted base of soil, a sand bed, compacted crushed stone and granite screenings compacted with a plate compactor, or fine asphalt. Provide good drainage and lay geotextile under the surface.
  • Rolls are laid on a ground base only from 24 mm thick, also over drainage and geotextile.

04Consumption per square metre

Per 10 mm of surfaceCrumbBinderPigment
Rubber crumb surface7 kg1.6 kg0.4 kg
EPDM surface9.5 kg1.6 kgnot needed

The base is primed with 0.23–0.40 kg/⁠m² of binder, depending on how absorbent it is. Teping AD RC binder takes 15–25 % of the crumb mass, depending on the crumb size.

05How the surface is laid

  1. Check the conditions: substrate from +15 to +25 °C, air humidity up to 85 %, no rain. Keep the components for a day at 20–25 °C.
  2. Prime the base with the binder using a flat trowel or a roller. The primer dries in 2–3 hours.
  3. Weigh the components. Mix the pigment into the crumb, then slowly add the binder and mix with a mixer until uniform.
  4. On large areas set screed rails. Place the mix 1.5 times thicker than the design thickness, spread it with trowels and compact it with rollers to the design thickness.
  5. Foot traffic is possible after 24 hours, the surface is fully dry after 72 hours; vehicles after 3–5 days.

06Choosing the thickness

Sport Classic and Sport EPDM are laid from 10 mm, the two-layer Sport Combi 12–20 mm. Under play equipment the thickness depends on the free fall height: tell us the height and the equipment, and we will suggest the build-up.

Sources. Based on the instructions and technical data sheets for Teping® products published at tnpgroup.ru and the TNP technical solutions album 2025. Always follow the instruction for the specific product and batch.

FAQ

Questions on this topic

Sport Classic, Sport EPDM or Sport Combi?

Sport Classic of black rubber crumb is the reliable budget option. Sport EPDM gives bright colours and withstands freeze-thaw cycles. Sport Combi combines a black crumb shock pad with a coloured EPDM top: bright and cost-effective.

Can a rubber surface be laid on asphalt or on the ground?

Yes. Asphalt and concrete are cleaned and primed with the binder. A ground base needs a compacted build-up of sand, crushed stone and screenings, good drainage and geotextile under the surface.

When can the playground be opened?

Foot traffic is possible after 24 hours, the surface is fully dry after 72 hours. Vehicles need 3–5 days.

How much binder does rubber crumb need?

Teping AD RC takes 15–25 % of the crumb mass, depending on the crumb size. For 10 mm of rubber crumb surface that is about 7 kg of crumb and 1.6 kg of binder per square metre.

Not sure which coating fits?

Describe the object, the loads and the conditions. The TNP technical team will suggest a system and send the documents.

PROJECT ENQUIRY

Let’s find the
right solution.

Prepare your enquiry, then copy it or open it in your email app to send to our team.

Ask our team for current technical and safety data sheets. Available document languages will be confirmed in reply.

This page prepares an email only. Nothing is sent until you send it from your email app.

Write directly to order@tnpgroup.ru