Teping® manufacturer
Visualiser
EN ⌄
Menu

Warehouses

Coal mine spare parts warehouse

5 mm epoxy floor on 1,380 m² of a warehouse for heavy loads.

Location
Nazarovo, Krasnoyarsk Territory, Russia
Area
1,380 m²
Thickness
5 mm
Coal mine spare parts warehouse, photo 1
Nazarovo, Krasnoyarsk Territory, Russia · 1,380 m² · Teping Floor 205 Industrial

How it was done

Epoxy floors

01

Task

A 5 mm self-levelling floor that resists heavy and intensive loads.

02

Solution

Priming, scratch coat with quartz sand and two coats of Teping Floor 205 Industrial.

03

Result

The floor is easy to clean and built for long service.

System on site

Coating layers

Layers and consumption per m² as they were applied on this site.

1234
  1. 1 PrimingTeping R 1155 Primer 0.28 kg
  2. 2 Scratch coatTeping Floor 205 Filler
    Quartz sand 0.1–0.3 mm
    0.39 kg
    0.21 kg
  3. 3 Base coatTeping Floor 205 Industrial 4.8 kg
  4. 4 TopcoatTeping Floor 205 Industrial 3.2 kg
  5. Total per m²8.88 kg

Order this system

Enter your area and the enquiry will include the system and approximate quantities. A technologist will check the substrate and prepare a calculation.

Estimate based on the consumption on this site. Exact quantities depend on the substrate and are calculated by a TNP technologist.

Products on this site

Let's discuss your site

Tell us about the area, substrate and loads. We will select a system from those already working on similar sites.

PROJECT ENQUIRY

Let’s find the
right solution.

Prepare your enquiry, then copy it or open it in your email app to send to our team.

Ask our team for current technical and safety data sheets. Available document languages will be confirmed in reply.

This page prepares an email only. Nothing is sent until you send it from your email app.

Write directly to order@tnpgroup.ru