How it was done
Floor paints
Task
Protect the tiles of an open veranda.
Solution
Grey epoxy paint Teping R 1155 over Teping R 1155 Primer primer.
Homes
Epoxy paint over tiles on a 22 m² veranda, done in 3 days.

How it was done
Protect the tiles of an open veranda.
Grey epoxy paint Teping R 1155 over Teping R 1155 Primer primer.
Site photos
System on site
Layers and consumption per m² as they were applied on this site.
Enter your area and the enquiry will include the system and approximate quantities. A technologist will check the substrate and prepare a calculation.
Estimate based on the consumption on this site. Exact quantities depend on the substrate and are calculated by a TNP technologist.
Technical solutions album
A close system is described in TNP's album: layers, consumption, service conditions and substrate requirements.
3.1Three-coat epoxy floor paintA simple, reliable coating up to 300 µm thick that dustproofs and hardens the substrate and makes it chemical- and water-resistant.
up to 0.3 mmLayers: 3−20 to +60 °COpen the systemTell us about the area, substrate and loads. We will select a system from those already working on similar sites.