How it was done
Sports surfaces
Task
Lay an impact-absorbing rubber surface on the footbridges of the Olympic Park.
Solution
A 15 mm surface of brightly coloured Teping Sport EPDM rubber granules bound with polyurethane.
Public spaces · Sports and playgrounds
Bright Teping Sport EPDM safety surfacing on 18,600 m² of footbridges.

How it was done
Lay an impact-absorbing rubber surface on the footbridges of the Olympic Park.
A 15 mm surface of brightly coloured Teping Sport EPDM rubber granules bound with polyurethane.
Site photos
System on site
Layers and consumption per m² as they were applied on this site.
Enter your area and the enquiry will include the system and approximate quantities. A technologist will check the substrate and prepare a calculation.
Estimate based on the consumption on this site. Exact quantities depend on the substrate and are calculated by a TNP technologist.
Technical solutions album
A close system is described in TNP's album: layers, consumption, service conditions and substrate requirements.
5.2Teping Sport EPDM safety surfaceA bright seamless surface of EPDM granules: the whole granule is coloured, so the colour lasts longer than pigmented crumb.
from 10 mmLayers: 3−30 to +60 °COpen the systemTell us about the area, substrate and loads. We will select a system from those already working on similar sites.